Today, the concrete crew was going to start pouring the driveway, but it was too wet from the rain we had over the weekend. So instead they excavated some of the base layer and replaced it to help it dry out faster. Everything around is saturated so hopefully it'll be dry enough tomorrow. The patio guys were back and they pressure washed of the release color layer and then sealed it so you can really see the finished color and texture. The contractors team worked on caulking around the windows and installing the cement board in the new shower.
Today was also the first day for the stone work. They spent most of the day prepping the surface for the stone but the did get a little of it installed. We're getting closer each day to the outside being done!