Today saw a lot of changes. The concrete crew was here and poured the new front sidewalk, part of the new turn-around, and the pad out by the little house. They should finish everything either on Friday or Monday depending on how everything goes. The stone crew got the entire one side of the house done. The top ledge between the stone and the siding will be installed last. Last, but not least, the contractors got started on the drywall and probably got about half of it done. It really helps you see what the kitchen will look like now that you can't see into our bedroom.