Lake Renovation: Day 34

Almost without fail, any time I write that something is supposed to happen tomorrow, it doesn't happen.  Anyway, today was more drywall work and then the poured the shower base and fixed up half of the closet floor.  The contractor delivered some of the tile today for the kitchen and bathroom but we're still a little ways from needing that.

I take pictures of the front of the house every day and today I realized that it's actually pretty much done.  With the exception of the front door, the outside of the house is pretty much finished.  So that's exciting!