Today was the end of week 9. With the exception of the countertops which will be late, everything else should be done within two weeks. The counter tops will likely be a week or two later. Not ideal but not terrible. Today the contractors worked on the shower tile, the kitchen trim, and the fireplace. The painters were here caulking the trim and doors so they can be painted soon.