Today they got a lot done. The new electric service was finally installed so we've got lights throughout the house again. The contractors worked on the floors more and are probably more than half done. The plumbers were back and installed two toilets, some of the shower, and the hot water heater. Another team was here to install a storm door. It doesn't look as nice with the storm door, but we like being able to leave the front door open so we can see outside. The appliances are back in the kitchen so we'll have a fridge and range soon. The dishwasher will have to wait until the counters, sink, and garbage disposal are in.