Lake Renovation: Day 48

Today was a little slower.  The electrician was here and we now have some working lights which run off the old service.  The new service still isn't connected but hopefully soon.  The contractors finished the fireplace tile and the tile in the bathroom.  The painters will be here the rest of the week to get everything painted and in good shape.

Lake Renovation: Day 47

Today was more tile work everywhere.  The contractors worked on tiling the bathroom floor, kitchen, and fireplace.  The stone guys also came back to finish up by the front door.

Lake Renovation: Day 46

Today was the start of week 10. This morning, a guy from Erie came to paint the guest bath tub. It used to be a faint pink color and now it's white. The picture isn't great because of the flash but it looks really good.  The contractor finished the fireplace trim so it's ready for painting and tile. They also poured a floor leveler in our bathroom so they can start on the tile floor in there. One of the painters was here working on prepping everything, filling nail holes, sanding, etc.

Tomorrow sounds like a big tile day and the week will wrap up with everything getting a final coat of paint and the floors going in early next week.

Lake Renovation: Day 45

Today was the end of week 9.  With the exception of the countertops which will be late, everything else should be done within two weeks.  The counter tops will likely be a week or two later.  Not ideal but not terrible.  Today the contractors worked on the shower tile, the kitchen trim, and the fireplace.  The painters were here caulking the trim and doors so they can be painted soon.


Lake Renovation: Day 44

The kitchen cabinets were delivered this morning are mostly installed this evening.  The electrician hooked up the new main lines to panel so they should be good to power it up soon.  None of the breakers are in yet though.  There was more tile work in the shower so that's coming along and looking really good.

Lake Renovation: Day 43

There was a lot of good progress today.  The front door was installed and looks really good.  The trim and inside doors are just about complete and the tile work started in the bathroom.  Tomorrow the kitchen cabinets should be delivered.

Lake Renovation: Day 42

Today was more windows and trim.  The electrician was back and run the cables to connect the new breaker panel to the utilities so we should start getting the new electric service soon.  The gutter people were here to move the offsets and they look a bit better now too.

Lake Renovation: Day 41

Today was the start of week 9.  The contractor was back and working on doors and trim.  They should have it finished by Wednesday or Thursday and then will start on the kitchen.